NORDHAUS / An eye for detail

Start with the loft floor

Understand accessible, uninhabited loft floors and how they differ from a habitable attic.

Close view of insulation material in an uninhabited loft.

03 / When this topic fits

An unused loft or a habitable attic?

For an accessible, uninhabited loft, consider the floor above the heated rooms. Use, access and existing construction provide the starting point for further planning.

Plan my project

What the scope considers

The scope begins with what is there.

  1. 01

    Record access, use and the existing floor construction.

  2. 02

    Include preparation and sensitive transitions in the scope.

  3. 03

    Coordinate insulation, necessary access routes and future use.

OUR PROCESS

01

Clarify use and access

02

Have the existing construction and junctions reviewed

03

Agree the scope and continued usability

THE NEXT STEP

Not sure where to begin?

A few clear questions can help describe your task. A clear first overview for your conversation.

Plan my project